Home | Case study | Royal Borough of Kingston

Communal boiler replacement

Sector

Social Housing

Location

Chessington, Surrey

Our M&E team installed a new boiler system based on Bosch Condens 7000 WP at 100kW each boiler. Two hot water cylinders with a capacity of 850 litres and 30-minute re-heat time for domestic services ensure uninterrupted hot water. Temperature Mixing Values (TMVs) deliver water to flats at approximately 50-55°C, pre-set to the client’s specification.

What we did

30-minute reheat and regulated hot water at 50-55°C reduces energy costs in 47 flats.

Specifications

  • Strip out existing plant room
  • New hydrogen-ready boilers
  • New hot water cylinders
  • New BMS System
  • New insulated pipework and TMVs
  • Water heating system flushed/cleaned

Project Overview

Number of months

2

Relationship since

2013

Number of flats

47

Our new communal boiler installation delivered improved and consistent heating and hot water supplies for residents and helped our client with Net Zero targets by providing hydrogen-ready boilers. Reduced heating bills and futureproofing/resilience to boiler failure are added benefits of our installation programme. Whilst works were ongoing, we minimised disruption to residents’ water and heating supplies and offered them heating alternatives.

innovations, challenges, solutions

New communal boiler system brings many benefits to residents and to our client.

We were always having trouble. Heating would go off. Or we’d have not hot water. Since they put the new boiler in, it’s absolutely perfect. They cleaned up after too. They were brilliant, did not leave a mess at all.. I had no complaints at all. I thank Axis for doing such a brilliant job.

Resident

RBK

They were very conscientious and did a very good job. They kept us in touch with all the works going on. Before that we had boilers breaking down. We lost heating and hot water. In the last six weeks the heating and hot water have worked perfectly.

Resident

RBK

Have a project to discuss?

023 8070 1111
mail@clcgroup.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

Read the full case study

You may also be interested in...

The Crown Estate

Refurbishment

Axis delivered heritage works at Grade Listed terraced townhouses on The Mall.

Swan Housing (Now Sanctuary)

Responsive Repairs

Axis delivered a 14-year Total Property Asset Management programme with Swan Housing Group.

Abri Group

Refurbishment

444 properties, installing 376 kitchens and 203 bathrooms in Bracknell and Ascot.

NHS Liverpool University Hospitals Foundation Trust

Building Compliance

15,000 actions across Broad Green Hospital and Aintree Hospital.

Walsall Housing Group

Responsive Repairs

Integrated responsive and planned repairs and maintenance contract with compliance services supports Walsall Housing Group.

Southern Housing

Responsive Repairs

42,000 repairs keep Southern Housing residents’ homes safe and comfortable.

Sanctuary

Responsive Repairs

Our Total Asset Management of 11,000 Sanctuary properties in London and Essex includes a comprehensive Responsive Repairs programme.

Exeter City Council

Decarbonisation

Bills reduced by 33% during the first year of SHDF funded works.

Premier Inn – Hampstead

Refurbishment

Entire hotel refurbishment, including compliance and M&E works, to 143 bedrooms over 8 floors.

Westminster City Council – Energy Efficiency

Decarbonisation

Solar panels and EWI increase thermal efficiency by 80% reducing energy costs by 30% in fully electric property.

Westminster City Council – Solar PV

Decarbonisation

Installing 844 solar watt PV modules generates an energy cost-saving 290,000kWh pa in 9 blocks.

Worshipful Company of Painter-Stainers

Refurbishment

Gilding and gold leafing craftmanship at Grade II* listed Livery Hall gained us coveted PDA award.

L&Q

Refurbishment

Installing energy efficient measures plus new kitchens and bathrooms modernised 140 homes in 46 terraced blocks.

Royal Borough of Kingston – ASHP

Decarbonisation

Installation of Air Source Heat Pump reduces carbon emissions by 18% and running costs by 50% pa.

Metropolitan Police – Hendon Training Centre

Refurbishment

In 8 weeks, Axis re-secured the perimeter of this training complex for new Police Officers.

Hyde

Building Compliance

Award-winning 18,000 m2 cladding replacement programme ensures safety of 440 families in 5 towers.

YMCA NORTH TYNESIDE

Refurbishment

New ventilation, lighting, AV and fire detection systems plus re-decoration works upgraded gym and community facilities.

Waitrose – Sushi Bar

Refurbishment

New sushi bar installations enhance three stores plus new self-service units and checkout areas.

Waitrose

Building Compliance

Waitrose entrusts us with multiple in-store refurbishment and Mechanical & Electrical contracts.

University of Nottingham

Refurbishment

Two projects ran concurrently for a fast turnaround, refurbishing 479 bedrooms  and 70 communal areas.

Rugby School Group

Refurbishment

24 pupils returned to robust and contemporary refurbishment of 4 dormitories after summer break.

Lift Schools

Refurbishment

Large-scale project redecorated 4500 m2 of space in just 3 weeks improving learning environment for students.

Student Cribs

Refurbishment

Top marks from students for new bathroom suites plus new kitchens and redecorated accommodation.

Southampton Solent University

Refurbishment

Staged floor-by-floor works ensured we upgraded 228 dormitory rooms in just 9 weeks.

Southampton City Council

Building Compliance

8,000 homes made safe and compliant through installation of 10,000 fire doors plus sprinklers and fire alarms.

Royal Borough of Kingston

M&E

30-minute reheat and regulated hot water at 50-55°C reduces energy costs in 47 flats.

Metropolitan Police – Romford

Refurbishment

High security informed our 6-week modernisation programme in live environment police station.

Riverside Housing – RAF Cosford

Refurbishment

Our Midlands Division conducts a long-term Refurbishment Programme in RAF family housing for Riverside Housing Association.

Riverside Housing – RAF Cosford – Bathrooms

Refurbishment

Installing 180 bathroom suites modernised 60 homes making them suitable for RAF families.

Outcomes First Group

Refurbishment

We installed 9 new bathrooms and 414 m2 of flooring ready for the students’ new term.

National Grid

Pylon Painting

CLC’s National Grid-authorised team safely paint 201,000 m2 of steelwork on 310,400 275kV towers and substations (2024.)

National Trust

Refurbishment

55 litres of paint re-decorated buildings at National Trust Grade I listed attraction.

MHA

Planned Maintenance

Bathroom replacements in branded corporate style ensured safety and convenience of 36 vulnerable residents.

Derbion

Refurbishment

In just 10 weeks we modernised 121,000 m2 of shopping centre for it 23m visitors and tenants.

Housing 21

Planned Maintenance

Accommodation modernisation provides brand new kitchens and bathrooms for elderly residents of 47 retirement properties..

Housing 21 – Carroll Gardens

Refurbishment

Redecorated accommodation and creation of additional facilities brighten up supported living facility.

Hoar Cross Hall Spa Hotel

Refurbishment

We replaced bathrooms and redecorated 96 rooms in busy Grade II listed hotel and spa.

DEFRA

Refurbishment

Reconfiguring 1,100m2 of space included installation of 600m of partitioning and 2,000m of insulation.

Metropolitan Police – Cobalt Square

Refurbishment

Axis’ specialist, security-cleared team converts 4-storey office block into open plan working areas.

Cheltenham Chase Hotel

Refurbishment

Flooring upgrades, partition construction and redecoration to 94 rooms successfully completed without disrupting guests.

London Fire Brigade

Refurbishment

Phased 9-week window renewal programme ensures emergency fire services continued uninterrupted.

Center Parcs

Refurbishment

We refurbished 125 lodges in just 16 weeks, aligning with our client's environmental goals.

Brentwood Borough Council

Responsive Repairs

Full asset management programme incorporating Responsive Repairs maintains 2400 homes to highest standards.

Accent

Planned Maintenance

We installed 376 kitchens and 203 bathrooms including DDA adaptations by our DBS checked staff.