Accommodation Conversion & Renovation

Sector

Retail & Commercial

Location

Alnwick

Service

Refurbishment

The refurbishment and conversion project created high quality residential space for the artists comprising: six bedrooms, each with an en-suite bath/shower WC; a DDA compliant bathroom and a shared office, dining area and kitchen.

What we did

Our Newcastle branch successfully delivered a comprehensive transformation of the detached office building next to the Alnwick District Playhouse.

Specifications

  • Full rewire and energy efficient lighting
  • Roof replacement and repairs
  • Stonework repairs and alterations
  • New heating system
  • Futureproofing for ASHP installation
  • New hot and cold water system
  • Sanitaryware installation
  • Full redecoration including flooring
  • Fire door and pocket door installation
  • Bespoke kitchen
  • DDA alterations including ramps, widening doorways, wet-rooms and automatic door systems
  • Structural alterations
  • Wall and underfloor insulation
  • Drainage alternations for new en-suites

Project Overview

Number of weeks

20

Number of bedrooms

6

Number of weeks early

10

Contract Value

£

417

K

Our team installed a new heating system to accommodate the integration of an air source heat pump (ASHP). This upgrade, along with the energy efficient lighting installed, will ensure that the artist accommodation is not only functional and comfortable, but the client also benefits from long-term energy savings.

innovations, challenges, solutions

Above and beyond the original scope of works, the team also provided futureproofing measures into the project.

Read the full case study

The delivery was to a high standard and the coordination of work was done seamlessly. The CLC team were attentive to our needs and were very good at offering cost efficient options to issues as they arose. Communication with [the Quantity Surveyor] Josh Morgan was excellent and we felt throughout that the project was in safe hands. CLC’s experience in refits for the hotel industry was obvious as they were aware of our need to open on time and the value of the rooms to us as clients.

Artistic Director

Alnwick Playhouse

Have a project to discuss?

023 8070 1111
mail@clcgroup.com

Please select an enquiry type

Please enter your first name

Please enter your surname

Please enter a valid email address

Please add description of enquiry

Please agree to the terms*

Thank you! Your form has been successfully submitted. Someone will be in touch with you soon.

Error sending form.

You may also be interested in...

Fire door close up of sign that says Fire Door Keep Shut

VIVO Defence Services – Dorset & Wiltshire Fire and Rescue

Fire Safety

With VIVO Defence we successfully completed fire safety works to five buildings including 277 fire door set replacements.

Premier Inn – Bank

Refurbishment

Refurbishment to 184 bedrooms was completed over a seven-month duration. Working floor by floor for maximum efficiency and minimal disruption...

Alnwick District Playhouse Trust

Refurbishment

We extended the roofs at all 36 properties to allow for extra 150 millimetres of EWI.

Housing 21 – Valentine Baker Court

Planned Maintenance

we successfully delivered 35 kitchen replacements at Valentine Baker Court, an independent living scheme for Housing 21.

Cardiff Community Housing Association (CCHA)

Decarbonisation

111.2 kw of SPV was installed across 35 properties in Cardiff. A further 16 properties are to be completed in...

The Crown Estate

Refurbishment

Axis delivered heritage works at Grade Listed terraced townhouses on The Mall.

Swan Housing (Now Sanctuary)

Responsive Repairs

Axis delivered a 14-year Total Property Asset Management programme with Swan Housing Group.

Abri Group

Refurbishment

444 properties, installing 376 kitchens and 203 bathrooms in Bracknell and Ascot.

NHS Liverpool University Hospitals Foundation Trust

Fire Safety

15,000 actions across Broad Green Hospital and Aintree Hospital.

Walsall Housing Group

Responsive Repairs

Integrated responsive and planned repairs and maintenance contract with compliance services supports Walsall Housing Group.

Southern Housing

Responsive Repairs

42,000 repairs keep Southern Housing residents’ homes safe and comfortable.

Sanctuary

Responsive Repairs

Our Total Asset Management of 11,000 Sanctuary properties in London and Essex includes a comprehensive Responsive Repairs programme.

Exeter City Council

Decarbonisation

Bills reduced by 33% during the first year of SHDF funded works.

Premier Inn – Hampstead

Refurbishment

Entire hotel refurbishment, including compliance and M&E works, to 143 bedrooms over 8 floors.

Westminster City Council – Energy Efficiency

Decarbonisation

Solar panels and EWI increase thermal efficiency by 80% reducing energy costs by 30% in fully electric property.

Westminster City Council – Solar PV

Decarbonisation

Installing 844 solar watt PV modules generates an energy cost-saving 290,000kWh pa in 9 blocks.

Worshipful Company of Painter-Stainers

Refurbishment

Gilding and gold leafing craftmanship at Grade II* listed Livery Hall gained us coveted PDA award.

L&Q

Refurbishment

Installing energy efficient measures plus new kitchens and bathrooms modernised 140 homes in 46 terraced blocks.

Royal Borough of Kingston – ASHP

Decarbonisation

Installation of Air Source Heat Pump reduces carbon emissions by 18% and running costs by 50% pa.

Metropolitan Police – Hendon Training Centre

Refurbishment

In 8 weeks, Axis re-secured the perimeter of this training complex for new Police Officers.

Hyde

Building Compliance

Award-winning 18,000 m2 cladding replacement programme ensures safety of 440 families in 5 towers.

YMCA NORTH TYNESIDE

Refurbishment

New ventilation, lighting, AV and fire detection systems plus re-decoration works upgraded gym and community facilities.

Waitrose – Sushi Bar

Building Compliance

New sushi bar installations enhance three stores plus new self-service units and checkout areas.

Waitrose

Building Compliance

Waitrose entrusts us with multiple in-store refurbishment and Mechanical & Electrical contracts.

University of Nottingham

Refurbishment

Two projects ran concurrently for a fast turnaround, refurbishing 479 bedrooms  and 70 communal areas.

Rugby School Group

Refurbishment

24 pupils returned to robust and contemporary refurbishment of 4 dormitories after summer break.

Lift Schools

Refurbishment

Large-scale project redecorated 4500 m2 of space in just 3 weeks improving learning environment for students.

Student Cribs

Refurbishment

Top marks from students for new bathroom suites plus new kitchens and redecorated accommodation.

Southampton Solent University

Refurbishment

Staged floor-by-floor works ensured we upgraded 228 dormitory rooms in just 9 weeks.

Southampton City Council

Fire Safety

8,000 homes made safe and compliant through installation of 10,000 fire doors plus sprinklers and fire alarms.

Royal Borough of Kingston

Building Compliance

30-minute reheat and regulated hot water at 50-55°C reduces energy costs in 47 flats.

Metropolitan Police – Romford

Refurbishment

High security informed our 6-week modernisation programme in live environment police station.

Riverside Housing – RAF Cosford

Refurbishment

Our Midlands Division conducts a long-term Refurbishment Programme in RAF family housing for Riverside Housing Association.

Riverside Housing – RAF Cosford – Bathrooms

Refurbishment

Installing 180 bathroom suites modernised 60 homes making them suitable for RAF families.

Outcomes First Group

Refurbishment

We installed 9 new bathrooms and 414 m2 of flooring ready for the students’ new term.

National Grid

Pylon Painting

CLC’s National Grid-authorised team safely paint 201,000 m2 of steelwork on 310,400 275kV towers and substations (2024.)

National Trust

Refurbishment

55 litres of paint re-decorated buildings at National Trust Grade I listed attraction.

MHA

Planned Maintenance

Bathroom replacements in branded corporate style ensured safety and convenience of 36 vulnerable residents.

Derbion

Refurbishment

In just 10 weeks we modernised 121,000 m2 of shopping centre for it 23m visitors and tenants.

Housing 21

Planned Maintenance

Accommodation modernisation provides brand new kitchens and bathrooms for elderly residents of 47 retirement properties..

Housing 21 – Carroll Gardens

Refurbishment

Redecorated accommodation and creation of additional facilities brighten up supported living facility.

Hoar Cross Hall Spa Hotel

Refurbishment

We replaced bathrooms and redecorated 96 rooms in busy Grade II listed hotel and spa.

DEFRA

Refurbishment

Reconfiguring 1,100m2 of space included installation of 600m of partitioning and 2,000m of insulation.

Cheltenham Chase Hotel

Refurbishment

Flooring upgrades, partition construction and redecoration to 94 rooms successfully completed without disrupting guests.

London Fire Brigade

Refurbishment

Phased 9-week window renewal programme ensures emergency fire services continued uninterrupted.

Center Parcs

Refurbishment

We refurbished 125 lodges in just 16 weeks, aligning with our client's environmental goals.

Brentwood Borough Council

Responsive Repairs

Full asset management programme incorporating Responsive Repairs maintains 2400 homes to highest standards.

Accent

Planned Maintenance

We installed 376 kitchens and 203 bathrooms including DDA adaptations by our DBS checked staff.