The project focused on the full refurbishment of kitchens and wet rooms across the scheme while residents remained in occupation. Delivered through an established framework and building on a long-standing relationship with the client, the programme aimed to improve both the quality and functionality of living spaces, while increasing the long-term value of the asset. Works were completed between March and December 2025, delivered on time and within budget. The programme spanned approximately nine months and was carefully sequenced to maintain access and minimise disruption in a live environment.
What we did
Housing 21 appointed CLC to deliver a £1.3m refurbishment programme at Berryhill Village, a large Extra Care scheme.
Number of months
9
Number of wet room adaptations
142
Number of kitchen upgrades
42
Contract Value
£
1.3
M
To address this, CLC implemented a bespoke solution, ensuring all bathrooms were upgraded to full level-access standards. This not only resolved the structural limitation but also significantly improved accessibility and safety for residents. The approach ensured consistency across the scheme and aligned all properties with modern expectations for usability.
Challenges
A key challenge was the condition of the existing building fabric, including areas where properties did not originally have level access wet room trays.